Before The Install
Trust starts before the first shingle comes off.
A professional process explains roof condition, system components, project timing, property protection, and warranty options before work begins.
- 01
InspectionEvaluate roof age, surface wear, attic concerns, flashing, ventilation, leaks, and storm exposure.
- 02
MeasurementsAccurate measurements determine materials, waste factors, layout complexity, and installation planning.
- 03
Ventilation AnalysisProper airflow affects roof lifespan, attic moisture, heat buildup, and shingle performance.
- 04
Material SelectionChoose shingles, colors, system components, ventilation, and warranty options that fit the home.
- 05
Property ProtectionLandscaping, siding, gutters, driveways, decks, and walkways protected before tear-off begins.
- 06
Tear-OffOld materials removed down to the deck so hidden issues can be found and corrected. Never roof over old layers.
- 07
Deck Inspection & RepairSoft spots, rot, moisture, and structural concerns corrected before the new roof system is installed.
- 08
Leak Barrier InstallationIce & water protection at eaves, valleys, chimneys, pipe boots, and all penetrations — full coverage, not just code minimum.
- 09
System InstallationUnderlayment, starter strips, shingles, flashing, ridge caps, and ventilation — installed layer by layer, manufacturer-spec.
- 10
Cleanup & Magnetic SweepAll debris removed. Magnetic nail sweep of the entire yard, driveway, and perimeter. Gutters cleared.
- 11
Final WalkthroughReview the finished project with the homeowner so everything completed is understood and documented.
- 12
Warranty RegistrationEligible systems registered and documentation prepared for homeowner records. Your 25-year coverage begins.